Over 124 billion soms were in circulation in Kyrgyzstan as of July 1Former Deputy Minister of Health of Kazakhstan suspected of embezzlement of over 500 million tenge

3.3 km of bypass road to Kara-Keche coal field excavated

 

Фотографии: akipress.kg

September 21, 2020, 14:26       Источник akipress.kg       Комментарии

AKIPRESS.COM - The bypass road 3,300 meters in length and 4 meters wide was excavated to the Kara-Keche coal field after the previously used road was blocked by slided rocks and land. 4 meters more of the road need to be excavated, the Ministry of Transport and Roads reported.
The landslide in the Kara-Keche gorge on September 14 blocked the road to the coal field. A special commission found it is impossible to clear the road from slided land and rocks and for this reason construction of the bypass road started.
The road runs along the slope of the mountain amid rocks. The road is contructed in two shifts.

Ссылка на новость:
https://for.kg/news-667355-en.html

 

SAPE:

 

АГРОПОРТАЛ КЫРГЫЗСТАНА, НОВОСТИ СЕЛЬСКОГО ХОЗЯЙСТВА
Обучение ювелирному делу в Бишкеке
МСН Общественно-политическая газета

18+

FOR.kg - Кыргызстан новости, пресса

FOR.kg search news service (news aggregator, media aggregator)

Read first Agreement on the use of the FOR.kg search site

When using materials from the FOR.kg - reference to the source is required

For all questions please contact customer support

Top.Mail.Ru